Wednesday, August 22, 2012

Some time later ...(part 3)

Right , where did I get to? end of the first week? OK

Sunday was spent emptying years worth of accumulated stuff from the last bedroom and the what will be the last bathroom. Upon doing this I discover a slight problem with the drains. The drains from the shower are leaking and water has spread over the concrete floor of the bathroom damaging some of the things we have stored there. Its not too bad, there is a bed (in pieces) that is probably ruined and some other small items. I set to work taking the drain to pieces and fixing it.
Eventually I have the place cleared and can start on the framing out.

Monday sees the plaster board go on to the framing and the door frame is glued on top of that. Then I can clear the bedroom floor and hoover it to be ready for the insulation. 40mm insulation goes down pretty well and I can start to bring up the 19mm chipboard that forms the floor. After the first couple of pieces I realize I have a bit of a problem. The framing timber I use is 50mm by 70mm and I have put the door on too low. Instead of 70mm high I have put the door in at 50 mm off the concrete which is not high enough to clear the flooring. So the frame has to come out and these frames are not designed top come out once they are glued in place. the glue had gone off and I was pretty lucky to pull the frame off without breaking bits. I lifted up the frame and re stuck it.

:
Tuesday saw the electrics, or at least the gaine and wires go in for the plug sockets. Now I realized another problem. The power for the lights was missing. Where could it come from? In the end I had to break out the skirting in the bedroom next door and feed and other cable from the light switch their down behind the wall out under the skirting, through the insulation out through a hole drilled in the timber under the doort frame, accross the landing and up to the switch in this bedroom. A complicated route that took a while to set up but It will work better than any other ideas which I had at the time including drilling through the concrete into the hot room which would have not been fun!
With the power just about sorted out I could finish the chipboard flooring for the bedroom.

On Wednesday I started on the stairs. The landing was insulated and chipboarded and slowly the stairs down towards the garage started to take shape.
Thursday saw the steps finished:

And although they look a bit wonky in this picture they are reasonably straight in real life.
The chip board was getting very scarce by the time I finished this as I did not want to go down to voirons again and its good to use up all the odds and ends lying about.
Thursday evening we went over to Annemaries place for a bbq.

Friday was spent cleaning up all the dust and rubbish that accumulates. I cleaned and hoovered the floors from top to bottom (all six floors!) and discovered a number of cracked tiles in both the kitchen and the hall. Apparently the severe winter had done a bit more than just break the water supply

Friday evening we had dinner with Rob and early on Saturday we left for the UK.

I am looking to return in October, quite when I am not certain when. I am looking forward to seeing the progress on Annemaries chalet. I think this was a fairly productive 2 weeks although I got off to a rocky start I think we pulled through and ended quite well. The salon is looking good all painted now. The underfloor heating is all in the lights in the salon are in. the kitchen is all trimmed and we are making reasonable progress on the last two rooms.

See you in October.





Some time later ...(part 2)

So we had electricity despite being told by the EDF that they had cut us off. OK I can live with that and now I had power I could actually do some work!

Wednesday morning I began by putting up the railings on the mezzanine. This involved bolting a chunk of wood in the middle and fixing together the same type of railings I had used for the stairway.

The top hand rail had to slotted to fit against the window frame but misses the window.
In the afternoon I installed the thermostat for the salons underfloor heating. This has been waiting to be done for a long while and I have avoided it as I knew it was going to be difficult. There are three gaine coming into a small embedded box. The power coming in, the load from the heat mats and also the thermostat. The thermostat is also pretty big and takes up a lot of the room so after trimming the gaine back as much as possible eventually I got it fitted.
I added trim to the fireplace:

This should hold and tidy up the laminate flooring edges quite well. The next job was to paint the walls with the textured paint. One pack did the kitchen wall and the dining room wall.

Thursday I decided to go visiting. Two couples I have met through this blog but never actually met in person are both building chalets in the next town down the valley. They had both said they would be in France while I was there and I thought this would be a good time to meet up.
Annemarie and Dave are building a chalet in La Moussiere, St Jean d'Aulps. They have had to spend a huge amount of money (more than they expected) on the foundations for their chalet and as such they have a lot less to spend on the actual building. We met them and they showed us round there building. They came back to my place for lunch which my eldest (surprisingly) launched into preparing lunch for six people without me having to say a word. I was impressed. Anyway we talked about money and electrics and each others plans. Annemarie and Dave want to be in their chalet by the end of the year in some fashion at least so my advice was to concentrate on getting the place warm (insulation and heat)  and getting a functioning bathroom and kitchen sorted.
It was great to meet up with someone I had only spoken to by blog and email and I look forward to seeing them again when we next go back.
Thursday evening I spent boxing out the chimney in the salon. Another job that has been bothering me for a while. I have always been unsure exactly how to do this. The builders left a mess of metal supports and firecell insulation around where the chimney went through the roof and I could not figure out the best way to cover it up. In the end as is usually best I just added timber until I had it square and then panelled it over with plaster board. The plaster board is far enough away from the chimney and it is separated from any heat by the firecell. When  this was painted in textured paint (Saturday) it looked quite good


Friday I decided to go visit the next couple I had talked to through my blog. His name is Calum and we went down to Les Seytroux to see his chalet. His chalet was beautiful. Its 8 bedrooms (i think) and it has been built to a really high standard. His wife and him along with both sets of parents are now decorating the inside of the chalet and it is his intention to live there permanently. Calum explained he had saved money by making a lot of use of ebay and by loading loads of stuff onto an arctic truck in the UK and transporting it all to France. His chalet looks amazing and I was very impressed.

Friday afternoon was spent trying to figure out how to wire up the consumer unit to spread the load over three phases. Hopefully making sure the the load is spread out will prevent the kind of tripping out we have had when the single phase we now have is overloaded.
For example the hob, which is a big demand device needs to go on a separate phase than the immersion heater which is another big demand. The radiators need to be spread out as well as the plugs and all the rest of the electrics. At the moment I had four rails of breakers and all of them are powered from a single phase. In the final wire up, each of the three phases would power a single rail and one will power two although the forth rail will be fairly empty. Anyway all this consideration had me thinking about the supply and wondering if I could already have three phase power. It all depended on what was live in the cabinet from EDF. Currently I only had one line connected up and I had assumed the other two wires were not live but our testing on Tuesday night told me that they were actually all live but only one connected. What would I need to connect all this up and get three phase power? Well I would need extra cables to go from one end of the garage to the other. I turned everything off and disconnected the consumer unit and earth. Pulled the neutral, phase and earth out from under the garage dragging a rope back through the duct. Then I used the rope to pull a neutral, three phase cables and the earth back to the consumer unit. A bit of connecting and when I switched the EDF box back on at the pole I had three phase power! So I went from no electricity on Monday to three phase power on Friday! With the consumer unit arranged and the loads spread out it should prevent the tripping out problems from now on!

Whilst rearranging the consumer unit I now have kitchen plugs that work, dining room plugs that work.The salon underfloor heating came on and started to warm up the floor. I even got round to wiring up the lights in the salon.

Saturday I started to clear out the bedroom and bathroom off all the boxes and boxes and boxes that had been stored down there over the last few years. One of the main aims of these two weeks was to build the dividing wall between the final bedroom and the last bathroom. A trip down to Voirons supplied the required wood for the partition wall and allowed me to get started.

Saturday evening was spent applying the textured paint to the new boxed out chimney and the concrete wall behind the fireplace. About half a tub of paint left, I painted the lower steps wall to use it up.


Not a bad end to the first week. The salon and dining room were getting very close to finished. Just the skirting board to go really. I had started the bedroom wall and most of all I had three phase electricity.

Tuesday, August 21, 2012

Some time later...(part 1)

Some time later we return to the chalet!

We haven't been back for nearly a whole year! Money problems have prevented any sort of break but we have to get this thing finished. As it is its worth about as much as I owe on it so if I walk now i get nothing for 7 years work. But with a few thousand pounds more to spend on it it could be worth nearly three times what I owe on it! So we really need to try hard for that last few thousand.

So we have rebooted the project with a fortnights trip to see if the place is still standing and so arriving on Saturday, late at night, the two boys and I discover there is no water and no electrics.
This is a bad, possibly fatal sign. OK put the boys to bed and as I have just driven for 14 hours door to door I will not be far behind them.

Sunday morning arrives and we discover that while we dont have electricity we do have cold water (in the hot water pipes, the cold water pipes appear to be "sieved" in about four places) Apparently Morzine has just had the coldest winter in memory with temperatures down to -30. All over the place pipes have frozen and burst. Even though I drained down all my pipes my cold water pipes have blown in a few places. One of the tap valves has cracked and needs replacing but I have a few bits that can be used to fix all but one of the leaks. No electrics, I still dont understand why as I cant see anything wrong. All I can think off is that we have been cut off through non payment of the bill. But its Sunday and there is nothing I can do until tomorrow so we all make the most of it. I still have the camping gas stove from years back somewhere in the garage and it still has some gas in it. We can use that to heat food and water. Its warm enough at night so we dont need heating. It looks like we could survive for a bit at least until I know whats going on.

Monday - Down to Voiron's to get plumbing bits and pay off the 3000 euro bill I have had with them since last time we when we built the balconies. They are great about it and shrug it off saying "OK but this time you pay at the end of your holiday", Hey no problem, they have effectively lent me 3000 euros for a year and I still have an account there.
I fix the leaks and so we now have cold and cold running water. So I look up EDF France on their website and even found some phone numbers for English customers in France but phoning these gets you into a recorded message about pressing 1 for this and 2 for that add to this that the descriptions are garbled in quick fire french, its impossible. So I determine that he nearest actual person I could talk to face to face is in Annemasse which is a good hour away. Into the car with everybody and down to Annemasse we go. Thank god for Sat Nav or we would never have found the place.

We wait for 2 hours before the lovely woman at the EDF tells us she that the EDF has never heard of me of my house or my connection and she knows nothing about anything I say. This is strange but she says I need the number on the electricity meter and that this would allow her to trace me. So back to Morzine we go and write down the number of the meter. Its now too late to go back so we spend another night in the dark, teaching my children how to play cards, dice and monopoly.

Tuesday morning, armed with the number on the meter we drive back to Annemasse and wait for another 2 hours while the assistants serve other customers and then just before the place closes for lunch our lovely lady works out that yes we have a connection and that we need to pay a vast sum of money and that they cant do anything until this vast sum is paid. But I cant pay it here. I need to phone this number and arrange with them to pay.
Now I kind of understand what has happened. Basically I haven paid my bill. But EDF set a ridiculous monthly direct debit of 90 odd euros and take it out of the bank each month. Now I use about 90 euros of electricity in a year so I would be thousands in credit. but no this does not matter. EDF take there money and figure out if they owe you anything eventually later. Anyway with the money problems I have they were not getting paid and as the address they had was in Zurich I was really none the wiser as to the extent of the situation. So it would appear that they had cut me off.

Tuesday night and Rob turns up knocking at the door. After a few words of explanation we are having a look at the various electric boxes and with the help of electric test screwdrivers (They contain a bulb that lights up when the end touches a live wire) we figured out that all the wires were live, even parts of the consumer unit in the chalet but somehow there was no power. Tracing the connection back we came across a broken connection. The neutral blue wire had become disconnected. It looked like the cable had been yanked back and this had broken the connection. A few screws of a screwdriver later and power was restored!

So now the kids could enjoy dvds and Nintendo DS instead of board games and cards and I have some power to do some work and after three days I am feeling very frustrated!

Tuesday, June 26, 2012

LINK REDACTED

Redacted, that what they do to military papers they dont want the public poking about in. Redact the salient facts, blank them out with thick heavy black lines so no one can see the words. Well I have now redacted my blog. All references to somewhere have now been removed on the wishes of the owner of that somewhere. I was asked quite politely by a company I no longer link to to remove my links to their company as the text of my link was skewing their google stats. Alternatively they asked if I would change the link to point at a more specific page on their site. Fine, they asked politely, I can remove their link on my blog, it was only there to help them, if they dont want it, fine by me. My disreputable blog dirtying their pure statistics. Then I get an email from my oldest friend saying they had contacted him and asked him to ask me to remove their links! Well OK I am not the fastest in the world but its only been a few days. My friend also believes that my disreputable blog is contaminating HIS stats as well and asked my to remove mention of his company as well. Not presenting a professional image! Well so be it. You dont need links from this tiny insignificant blog, fine they are gone. You have been redacted from this blog. In a couple of days, when ever googles crawler, spiders this blog - no more links or even a mention.